{"id":1249,"date":"2024-03-21T14:21:59","date_gmt":"2024-03-21T13:21:59","guid":{"rendered":"https:\/\/www.otja.es\/asturias-h2-valley\/"},"modified":"2024-11-13T14:08:06","modified_gmt":"2024-11-13T13:08:06","slug":"asturias-h2-valley","status":"publish","type":"post","link":"https:\/\/www.otja.es\/en\/asturias-h2-valley\/","title":{"rendered":"Asturias H2 Valley"},"content":{"rendered":"\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Project<\/strong><\/td><td>ASTURIAS H2 VALLEY<\/td><\/tr><tr><td><strong>Promoter<\/strong><\/td><td>EDP<\/td><\/tr><tr><td><strong>Brief description<\/strong><\/td><td>Installation of a renewable hydrogen production plant based on electrolyzers on the land of the Abo\u00f1o coal-fired power plant.<\/td><\/tr><tr><td><strong>Main characteristics<\/strong><\/td><td>Location: Abo\u00f1o Installed capacity: 500 MW in electrolyzers H2 production: 68,000 t\/year Power Associated photovoltaic installation: Planned uses: industrial (cement, chemical), energy, transport and NH3 production Planning in 2 phases: First Phase: 150MW Second Phase: 350MW  <\/td><\/tr><tr><td><strong>Execution period<\/strong><\/td><td>2023-2030<\/td><\/tr><tr><td><strong>Total budget (\u20ac)<\/strong><\/td><td>500 M\u20ac<\/td><\/tr><\/tbody><\/table><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Project ASTURIAS H2 VALLEY Promoter EDP Brief description Installation of a renewable hydrogen production plant based on electrolyzers on the land of the Abo\u00f1o coal-fired power plant. Main characteristics Location: Abo\u00f1o Installed capacity: 500 MW in electrolyzers H2 production: 68,000 t\/year Power Associated photovoltaic installation: Planned uses: industrial (cement, chemical), energy, transport and NH3 production [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1115,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[17],"tags":[],"class_list":["post-1249","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-private-initiatives"],"jetpack_featured_media_url":"https:\/\/www.otja.es\/wp-content\/uploads\/2024\/03\/Logo-EDP-1.png","_links":{"self":[{"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/posts\/1249","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/comments?post=1249"}],"version-history":[{"count":1,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/posts\/1249\/revisions"}],"predecessor-version":[{"id":1251,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/posts\/1249\/revisions\/1251"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/media\/1115"}],"wp:attachment":[{"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/media?parent=1249"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/categories?post=1249"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/tags?post=1249"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}