{"id":2415,"date":"2026-06-25T09:46:43","date_gmt":"2026-06-25T07:46:43","guid":{"rendered":"https:\/\/www.otja.es\/gaslab-project\/"},"modified":"2026-06-25T09:52:46","modified_gmt":"2026-06-25T07:52:46","slug":"gaslab-project","status":"publish","type":"post","link":"https:\/\/www.otja.es\/en\/gaslab-project\/","title":{"rendered":"Gaslab Project"},"content":{"rendered":"\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Project<\/strong><\/td><td>ArcelorMittal&#8217;s AlimerkaGasLab Environmental Sustainability Strategy<\/td><\/tr><tr><td><strong>Promoter<\/strong><\/td><td>ArcelorMittal \/ H2Asturias Consortium<\/td><\/tr><tr><td><strong>Brief description<\/strong><\/td><td>Pilot and research facility for the development of efficient combustion technologies, CO\u2082 capture, and CCU, and to demonstrate the use of renewable hydrogen in industrial processes where emissions reduction is particularly challenging.<\/td><\/tr><tr><td><strong>Execution period<\/strong><\/td><td>2024-2027<\/td><\/tr><tr><td><strong>Total budget (\u20ac)<\/strong><br\/><\/td><td>6,600,000 \u20ac.<\/td><\/tr><tr><td><strong>Other information of interest<\/strong><\/td><td>The project is funded by regional authorities and the Recovery, Transformation, and Resilience Plan, with European Next Generation EU funds.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<figure class=\"wp-block-image aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"418\" height=\"242\" src=\"https:\/\/www.otja.es\/wp-content\/uploads\/2026\/06\/q.jpg\" alt=\"otja\" class=\"wp-image-2406\" style=\"width:905px;height:auto\" title=\"\" srcset=\"https:\/\/www.otja.es\/wp-content\/uploads\/2026\/06\/q.jpg 418w, https:\/\/www.otja.es\/wp-content\/uploads\/2026\/06\/q-300x174.jpg 300w\" sizes=\"auto, (max-width: 418px) 100vw, 418px\" \/><\/figure>\n\n<figure class=\"wp-block-image aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"276\" height=\"215\" src=\"https:\/\/www.otja.es\/wp-content\/uploads\/2026\/06\/d.jpg\" alt=\"otja\" class=\"wp-image-2408\" style=\"width:907px;height:auto\" title=\"\"><\/figure>\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"380\" src=\"https:\/\/www.otja.es\/wp-content\/uploads\/2026\/06\/g-1024x380.png\" alt=\"otja\" class=\"wp-image-2410\" style=\"width:906px;height:auto\" title=\"\" srcset=\"https:\/\/www.otja.es\/wp-content\/uploads\/2026\/06\/g-1024x380.png 1024w, https:\/\/www.otja.es\/wp-content\/uploads\/2026\/06\/g-300x111.png 300w, https:\/\/www.otja.es\/wp-content\/uploads\/2026\/06\/g-768x285.png 768w, https:\/\/www.otja.es\/wp-content\/uploads\/2026\/06\/g.png 1146w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"177\" src=\"https:\/\/www.otja.es\/wp-content\/uploads\/2026\/06\/s.jpg\" alt=\"otja\" class=\"wp-image-2412\" title=\"\"><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Project ArcelorMittal&#8217;s AlimerkaGasLab Environmental Sustainability Strategy Promoter ArcelorMittal \/ H2Asturias Consortium Brief description Pilot and research facility for the development of efficient combustion technologies, CO\u2082 capture, and CCU, and to demonstrate the use of renewable hydrogen in industrial processes where emissions reduction is particularly challenging. Execution period 2024-2027 Total budget (\u20ac) 6,600,000 \u20ac. Other information [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1114,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[17],"tags":[],"class_list":["post-2415","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-private-initiatives"],"jetpack_featured_media_url":"https:\/\/www.otja.es\/wp-content\/uploads\/2024\/03\/Logo_Arcelor_Mittal.png","_links":{"self":[{"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/posts\/2415","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/comments?post=2415"}],"version-history":[{"count":1,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/posts\/2415\/revisions"}],"predecessor-version":[{"id":2416,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/posts\/2415\/revisions\/2416"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/media\/1114"}],"wp:attachment":[{"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/media?parent=2415"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/categories?post=2415"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/tags?post=2415"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}