{"id":3049,"date":"2026-07-29T10:11:28","date_gmt":"2026-07-29T08:11:28","guid":{"rendered":"https:\/\/www.otja.es\/decision-on-the-public-tender-for-the-award-of-evacuation-capacity-in-the-electric-power-grid-at-the-narcea-400-kv-transition-node\/"},"modified":"2026-07-29T10:11:45","modified_gmt":"2026-07-29T08:11:45","slug":"decision-on-the-public-tender-for-the-award-of-evacuation-capacity-in-the-electric-power-grid-at-the-narcea-400-kv-transition-node","status":"publish","type":"post","link":"https:\/\/www.otja.es\/en\/decision-on-the-public-tender-for-the-award-of-evacuation-capacity-in-the-electric-power-grid-at-the-narcea-400-kv-transition-node\/","title":{"rendered":"Decision on the public tender for the award of evacuation capacity in the electric power grid at the Narcea 400-kV transition node"},"content":{"rendered":"\n<p class=\"has-medium-font-size wp-block-paragraph\">On July 29, 2026, the Official State Gazette (BOE) published the decision resolving the public tender for the concession of evacuation capacity to the electric power grid for renewable electricity generation facilities at the Narcea 400-kV Just Transition Hub.<\/p>\n\n<p class=\"wp-block-paragraph\">The final allocation of 320 MW (MGES) of transmission capacity to the electric power grid for renewable electricity generation facilities at the Narcea 400 kV transition node, in favor of <strong>La Barca Energ\u00eda, SL,<\/strong> for its facility known as <strong>\u201cCHR La Barca.\u201d<\/strong> The access capacity awarded in the tender is <strong>320 MW (MGES)<\/strong>, with the installed capacity of the future <strong>La Barca Reversible Hydroelectric Power Plant being 320 MW<\/strong>. <\/p>\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.boe.es\/boe\/dias\/2026\/07\/29\/pdfs\/BOE-A-2026-16530.pdf\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Link to the Official State Gazette (BOE)<\/a><\/div>\n<\/div>\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On July 29, 2026, the Official State Gazette (BOE) published the decision resolving the public tender for the concession of evacuation capacity to the electric power grid for renewable electricity generation facilities at the Narcea 400-kV Just Transition Hub. The final allocation of 320 MW (MGES) of transmission capacity to the electric power grid for [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1040,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","jetpack_post_was_ever_published":false},"categories":[16],"tags":[],"class_list":["post-3049","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"jetpack_featured_media_url":"https:\/\/www.otja.es\/wp-content\/uploads\/2023\/05\/favicon-otja.png","_links":{"self":[{"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/posts\/3049","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/comments?post=3049"}],"version-history":[{"count":1,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/posts\/3049\/revisions"}],"predecessor-version":[{"id":3050,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/posts\/3049\/revisions\/3050"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/media\/1040"}],"wp:attachment":[{"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/media?parent=3049"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/categories?post=3049"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/tags?post=3049"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}