{"id":3077,"date":"2026-08-05T13:17:06","date_gmt":"2026-08-05T11:17:06","guid":{"rendered":"https:\/\/www.otja.es\/asturias-receives-e7-3-million-in-funding-under-the-idaes-repoten-2-program\/"},"modified":"2026-08-05T13:17:16","modified_gmt":"2026-08-05T11:17:16","slug":"asturias-receives-e7-3-million-in-funding-under-the-idaes-repoten-2-program","status":"publish","type":"post","link":"https:\/\/www.otja.es\/en\/asturias-receives-e7-3-million-in-funding-under-the-idaes-repoten-2-program\/","title":{"rendered":"Asturias Receives \u20ac7.3 Million in Funding Under the IDAE&#8217;s REPOTEN 2 Program"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The IDAE has published the list of beneficiaries of the REPOTENC 2 program, which supports investment in the repowering of wind farms and the technological and environmental modernization of small hydroelectric plants with a capacity of up to 50 MW.<\/p>\n\n<p class=\"wp-block-paragraph\">The call for proposals supports 81 initiatives to replace wind turbines and 92 initiatives for the technological and environmental modernization of small hydroelectric plants. Asturias is represented by a total of 7 hydroelectric plants, with a total investment of \u20ac7.3 million, located in Amieva, Tineo, Somiedo, Quir\u00f3s, and Cabrales, which generate a total of 161.12 MW of hydroelectric power. <\/p>\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/sede.idae.gob.es\/sites\/default\/files\/documentos\/2026\/Enegias%20Renovables\/REPOTEN2\/_427_resol_see_repotenc2.pdf\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Resolution Granting a License<\/a><\/div>\n<\/div>\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The IDAE has published the list of beneficiaries of the REPOTENC 2 program, which supports investment in the repowering of wind farms and the technological and environmental modernization of small hydroelectric plants with a capacity of up to 50 MW. The call for proposals supports 81 initiatives to replace wind turbines and 92 initiatives for [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":3075,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","jetpack_post_was_ever_published":false},"categories":[16],"tags":[],"class_list":["post-3077","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"jetpack_featured_media_url":"https:\/\/www.otja.es\/wp-content\/uploads\/2026\/08\/REPOTEN-2.png","_links":{"self":[{"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/posts\/3077","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/comments?post=3077"}],"version-history":[{"count":1,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/posts\/3077\/revisions"}],"predecessor-version":[{"id":3078,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/posts\/3077\/revisions\/3078"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/media\/3075"}],"wp:attachment":[{"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/media?parent=3077"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/categories?post=3077"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.otja.es\/en\/wp-json\/wp\/v2\/tags?post=3077"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}