Project | ASTURIAS H2 VALLEY |
Promoter | EDP |
Brief description | Installation of a renewable hydrogen production plant based on electrolyzers on the land of the Aboño coal-fired power plant. |
Main characteristics | Location: Aboño Installed capacity: 500 MW in electrolyzers H2 production: 68,000 t/year Power Associated photovoltaic installation: Planned uses: industrial (cement, chemical), energy, transport and NH3 production Planning in 2 phases: First Phase: 150MW Second Phase: 350MW |
Execution period | 2023-2030 |
Total budget (€) | 500 M€ |