ProjectASTURIAS H2 VALLEY
PromoterEDP
Brief descriptionInstallation of a renewable hydrogen production plant based on electrolyzers on the land of the Aboño coal-fired power plant.
Main characteristicsLocation: Aboño Installed capacity: 500 MW in electrolyzers H2 production: 68,000 t/year Power Associated photovoltaic installation: Planned uses: industrial (cement, chemical), energy, transport and NH3 production Planning in 2 phases: First Phase: 150MW Second Phase: 350MW
Execution period2023-2030
Total budget (€)500 M€