Located in Valledor, the concern of the neighbors about the cost of energy has led us since 2020 to study the feasibility of a community solar farm. Initially, the costs and the lack of access to the grid made the project difficult. In 2024 FAEN informed us of a change in the regulations that facilitated access to the grid and, on the other hand, the opportunity arose from the Nudo de Soto de la Barca tender that allowed us to reach an agreement with EDP to collaborate with us on the solar farm. Both factors have made it possible to start up the project.
| Performance | Solar photovoltaic system with storage Sustainable mobility |
| Power | 17 kWp |
| Legal Figure | Association |
| Partners | 3 citizens In process of new incorporations, until 14 |
| Location | Fonteta, Allande |
| Other information | Installation located on the ground |